PMP认证考试练习题(17,18)
1、【 单选题 】
creation of project objectives: [2.5分]
、 allows for data collection and analysis and progress reporting against which standards of performance can be measured.
、 is accomplished by selection of measurable variables against which performance can be judged.
、 is required before funding of the project by the project sponsor.
、 all of the above.
、 a and b only
答案:
2、【 单选题 】
a legally binding document offered unilaterally is a (    ) . [2.5分]
、 purchase order
、 scope of work description
、 contract stipulation
、 level of effort proposal
、 request for proposal
答案:
3、【 单选题 】
a technical requirement has which of the following characteristics: [2.5分]
、 easy to understand
、 a communication tool between the user and the design team
、 written in non-technical language
、 developed in cooperation with the user
、 typically describe physical dimensions and performance requirements
答案:
4、【 单选题 】
during which phase of the project life cycle is the amount at stake lowest? [2.5分]
、 concept
、 development
、 execution
、 conclusion
、 c and d
答案:
5、【 单选题 】
if a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the project
manager should assume: [2.5分]
、 the message was understood
、 the message was not understood
、 the subordinate discarded the information
、 the information was not appropriate
、 none of the above.
答案:
6、【 单选题 】
techniques that can improve communication include: [2.5分]
、 establishing a single, one-way communications channel
、 avoiding face-to-face communication
、 using redundancy (i.e. saying it two different ways) whenever possible
、 disregarding the sensitivity of your receiver
、 all of the above.
答案:
7、【 单选题 】
the delphi method is well-suited for: [2.5分]
、 decision-making
、 forecasting
、 overhead rate estimating
、 all of the above
、 a and b only
答案:
8、【 单选题 】
inspection of a complex project according to specifications is accomplished by (    ). [2.5分]
、 inspection by attributes.
、 cyclical inspection
、 quality conformance inspection
、 original inspection
、 none of the above.
答案:
9、【 单选题 】
the zero defects concept [2.5分]
、 is a performance standard for management
、 is a motivational technique that promotes "doing it right the first time".
、 is used by management to communicate to all employees that everyone should do things right the first time.
、 a and c.
、 b and c
答案:
10、【 单选题 】
what tool have project managers come to use to identify all of the costs associated with a project. [2.5分]
、 a bill of materials
、 a gantt chart
、 an arrow diagram network.
、 a work breakdown structure.
、 b and c only.
答案:
11、【 单选题 】
the difference between the bcws and the bcwp is referred to as the: [2.5分]
、 schedule variance
、 cost variance.
、 estimate of completion
、 actual cost of the work performed
、 none of the above
答案:
12、【 单选题 】
"paraphrasing" is most closely associated with which part of the communication process? [2.5分]
、 encoding
、 decoding
、 barriers
、 feedback
、 none of the above.
答案:
13、【 单选题 】
(    ) is a receipt issued by a carrier for merchandise to be delivered to a party at some destination. [2.5分]
、 proforma invoice
、 inspection certificate
、 packing list
、 bill of lading
、 none of the above.
答案:
14、【 单选题 】
a program is characterized as: [2.5分]
、 a grouping or related tasks lasting one year or less.
、 a unique undertaking having a definite time period.
、 a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.
、 a project with a cost over $1 million.
、 none of the above.
答案:
15、【 单选题 】
a gantt chart is useful in determining: [2.5分]
、 the level of effort for a task
、 when a task starts and stops
、 how tasks are related to each other
、 who is assigned to do a task
、 all of the above.
答案:
16、【 单选题 】
a contract originated bilaterally may be developed by (    ) . [2.5分]
、 quotation request from suppliers
、 proposal request
、 bid invitation release
、 b and c
、 all of the above.
答案:
17、【 单选题 】
in a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance
review? [2.5分]
、 not working directly with the assigned functional employees
、 employees spend only a short amount of time assigned to the project
、 not being knowledgeable enough to evaluate employees on technical judgment
、 all of the above
、 a and b only
答案:
18、【 单选题 】
from an operating or functional perspective, there are various objectives of purchasing and materials management. which is not one of these
objectives? [2.5分]
、 to buy competitively
、 to support company operations with an uninterrupted flow of materials and services
、 to develop reliable and effective sources of supply
、 to achieve maximum integration with the other departments of the firm
、 to attain approval from each department of every purchase
答案:
19、【 单选题 】
upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are
referred to as the: [2.5分]
、 baseline costs
、 budgeted costs.
、 estimates upon completion costs
、 scheduled costs
、 none of the above
答案:
20、【 单选题 】
in order to achieve long-term quality improvements, management must do the following: [2.5分]
、 motivate the employees with seminars, contests, and institute programs such as "quality improvement' day.
、 create a quality control department and give the head of the department ultimate responsibility for quality improvement.
、 implement of a formal quality control program with worker and management involvement.
、 establish financial incentive packages for worker.
、 a and d
答案:
21、【 单选题 】
which of the following is not a definition to determine a product's ability to operate as intended? [2.5分]
、 distance
、 performance
、 function
、 condition
、 all are definitions
答案:
22、【 单选题 】
team members want to work for a project manager that can provide them with career path planning. in which organizational form is career
path planning difficult for project employees? [2.5分]
、 matrix
、 pure project
、 project coordinator
、 project expediter
、 classical/traditional
答案:
23、【 单选题 】
the swiftest and most effective communications take place among people with [2.5分]
、 common points of view
、 dissimilar interests
、 advanced degrees
、 the ability to reduce perception barriers
、 good encoding skills
答案:
24、【 单选题 】
a work breakdown structure is most useful for: [2.5分]
、 identifying individual tasks for a project
、 scheduling the start of tasks
、 developing a cost estimate
、 determining potential delays
、 a and c
答案:
25、【 单选题 】
typically, during which phase in a project life cycle are most of the project expenses incurred. [2.5分]
、 concept phase
、 development of design phase
、 execution phase.
、 termination phase.
、 none of the above
答案:
26、【 单选题 】
the primary consideration of product management is to know the (    ). [2.5分]
、 probability of product's performance with specified parameters
、 ability the product has to perform its intended function
、 ability of a product to be produced within existing parameters
、 functionality the product will provide over its useful life
、 all of the above
答案:
27、【 单选题 】
communication always makes use of. [2.5分]
、 symbols
、 words
、 language
、 gestures
、 all of the above.
答案:
28、【 单选题 】
fixed-price contracts place more risk on the (    ) . [2.5分]
、 owner
、 contractor
、 seller
、 b and c
、 all of the above.
答案:
29、【 单选题 】
the reason that cost management is so difficult in project management is that: [2.5分]
、 projects by definition and nature are non-recurring events and are therefore difficult to predict.
、 there are no tools for identifying project tasks.
、 project managers do not care about tracking costs, as only schedules are important to all project managers.
、 a and b only
、 b and c only
答案:
30、【 单选题 】
the best way to insure quality conformance is to (    ). [2.5分]
、 distribute the responsibility to subordinates.
、 maintain total control.
、 train each worker to implement the work.
、 inspect quality into the project.
、 none of the above.
答案:
31、【 单选题 】
using visual aids during management/customer presentations will: [2.5分]
、 hold the interest of the audience
、 strengthen the learning process by adding a visual dimension to the auditory dimension
、 stay in view longer, thus bringing back listeners who may have strayed
、 all of the above.
、 a and b only
答案:
32、【 单选题 】
the project charter is developed by: [2.5分]
、 senior management
、 the customer
、 the project manager
、 both a and c
、 none of the above.
答案:
33、【 单选题 】
a contract is legally binding and must comprise all but one of the following: [2.5分]
、 legal capacity
、 mutual assent
、 approved negotiations
、 consideration
、 legality
答案:
34、【 单选题 】
when a project manager is running over the budgeted costs, the project manager can typically (    ) to attempt to get the project back on
budget. [2.5分]
、 reduce features and/or functionality
、 increase risk.
、 incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
、 all of the above.
、 a and b only
答案:
1
共1页,共34个题库
共1页,共34个题库
轻速云给您提供更好的在线考试系统服务!
推荐
推荐题库
众多企事业单位的信赖之选
36万+企事业单位的共同选择
查看更多合作案例
众多企事业单位的信赖之选
开始使用轻速云组织培训考试
四步组织一场考试答题,一键搭建企业培训平台
免费使用 免费使用 预约演示
咨询热线
400-886-8169
周一到周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1 轻速云科技提供专业的在线考试系统、在线培训系统
联系我们
客服热线客服热线:400-886-8169 | 周一至周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1
轻速云科技提供专业的在线考试系统、在线培训系统
在线咨询 400-886-8169