PMP认证考试练习题(19,20)
1、【 单选题 】
history has shown that project managers can be trained in a combination of ways. which method is usually
preferred by most companies? [2.5分]
、 experiential learning, on-the-job
、 formal education and special course (degreed programs)
、 professional activities, seminars
、 individual readings
、 none of the above
答案:
2、【 单选题 】
the purpose of configuration management is to: [2.5分]
、 insure drawings are updated
、 control change throughout the project
、 control change during the production only
、 generate engineering change proposals
、 inform the project manager of changes
答案:
3、【 单选题 】
the quality risk (    ) . [2.5分]
、 is minimized through continuous monitoring.
、 is considered a long term risk.
、 will be reflected in the in-service life of the project result.
、 b and c
、 all of the above.
答案:
4、【 单选题 】
three types of written media used in organizations are (    ), (    ), and (    ). [2.5分]
、 manual, letters, guidelines
、 individually-oriented, legally-oriented, organizationally oriented
、 guidelines, forms, procedures
、 letters, guidelines, brochures
、 letters, contracts, policies.
答案:
5、【 单选题 】
the act of conducting or supervising the exchange of information is: [2.5分]
、 consulting
、 project management
、 communications management
、 communications enhancement
、 none of the above
答案:
6、【 单选题 】
the core function of the project manager is [2.5分]
、 systems design
、 client interfacing
、 quality assurance
、 integration
、  
答案:
7、【 单选题 】
which of the following is considered a direct cost for producing a widget? [2.5分]
、 the cost of the materials used to produce a widget.
、 the labor costs of the workers who actually produced the widget.
、 the rent for the building in which the widget was manufactured
、 the salary of senior management and the project sponsor
、 a and b only
答案:
8、【 单选题 】
(    ) best describes the goal of a project in its relationship with the customer, from initial contact
through delivery. [2.5分]
、 fitness for use
、 customer satisfaction
、 conformance to requirements
、 fitness for purpose
、 all of the above.
答案:
9、【 单选题 】
the future value of an annual income flow of $1000 for 2 years at 10% is: [2.5分]
、 2200
、 2280
、 2300
、 2310
、 none of the above
答案:
10、【 单选题 】
a communicator can present information using the following media except: [2.5分]
、 visual
、 audio
、 tactile
、 performal
、 both a and b
答案:
11、【 单选题 】
the initial cost of a product and the product's operation and maintenance costs (    ) . [2.5分]
、 increases perceived value when balanced.
、 are incidental to each other because initial costs are "sunk"
、 decreases design costs as operation periods increase
、 provides perceived function value and product social dysfunction
、 are integrally related with each other because initial costs are "sunk".
答案:
12、【 单选题 】
advantages of the functional (hierarchical) form of organization include (    ) and creation of technical
competence. [2.5分]
、 ease of horizontal coordination
、 clearly defined authority
、 high information processing capability
、 single voice to customers
答案:
13、【 单选题 】
quality and (    ) are directly related. [2.5分]
、 productivity
、 cost overruns
、 scope control
、 pareto diagram
、 none of the above.
答案:
14、【 单选题 】
quality improvement programs are normally associated with which two of the following? [2.5分]
、 juran and crosby
、 juran and deming
、 crosby and deming
、 deming and the japanese
、 crosby and the japanese
答案:
15、【 单选题 】
resource leveling will often affect the project by making it: [2.5分]
、 shorter.
、 longer
、 more responsive to customer needs.
、 a and c
、 b and c.
答案:
16、【 单选题 】
selection criteria for project selection include: [2.5分]
、 cost versus benefit
、 risk
、 contribution towards organizational goals
、 rate of return
、 all of the above.
答案:
17、【 单选题 】
the document authorizing functional areas to charge against the project is the: [2.5分]
、 work authorization form
、 scope baseline
、 project charter
、 management plan
、 linear responsibility chart
答案:
18、【 单选题 】
the purpose of a dummy activity in an activity-on-arrow diagram is to: [2.5分]
、 identify a task that could be replaced by another.
、 take the slack time into account.
、 show a task that is not necessarily needed.
、 denote a milestone.
、 show a dependency relationship.
答案:
19、【 单选题 】
the statement of work (sow) is developed during the (    ) cycle. [2.5分]
、 award
、 solicitations
、 requirements
、 contractual
、 requisitions
答案:
20、【 单选题 】
which of the following depreciation methods provides for accelerated depreciation of an asset: [2.5分]
、 double declining balance.
、 straight line.
、 exponential depreciation
、 double sum of the years digits
、 double increasing balance
答案:
21、【 单选题 】
when planning, organizing, coordinating, and controlling a project an important human resources skill or ability would be [2.5分]
、 building multi-disciplinary teams
、 managing conflict
、 communicating orally and in writing with all levels of personnel
、 involving senior management
、 all are important
答案:
22、【 单选题 】
which is not a negotiation tactic? [2.5分]
、 imposing deadlines
、 surprises
、 person with authority is absent
、 reasoning together
、 all are negotiations tactics
答案:
23、【 单选题 】
a plan has budgeted three weeks of effort for consultants, but the job was done in only two weeks. calculate the variance: [2.5分]
、 0.015
、 0.33
、 0.75
、 0.67
、 none of the above.
答案:
24、【 单选题 】
which of the following is referred to as sunk cost: [2.5分]
、 management reserve
、 contingency fund
、 cost budgeted for construction under water
、 expended funds over which there is no further control
、 forecasted budget over-runs
答案:
25、【 单选题 】
a warranty may not be a remedy for products delivered unfit when (    ) . [2.5分]
、 the pm has knowledge of the product, inspected it without relying on the seller's skill
、 the products delivered comply with the plans and specifications of the client
、 the plans and specifications produced by the seller match the completed product.
、 a and b
、 none of the above.
答案:
26、【 单选题 】
a project manager believes that modifying the scope of the project may provide added value for the customer. the project manager should: [2.5分]
、 change the scope baseline
、 prepare a variance report
、 call a meeting of the configuration control board
、 change the project's objectives
、 postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
答案:
27、【 单选题 】
graphical displays of accumulated cost and labor hours, plotted as a function of time, are called: [2.5分]
、 variance reports
、 s curves
、 trend analysis
、 earned value reporting
、 baseline control
答案:
28、【 单选题 】
as a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is: [2.5分]
、 insignificant.
、 reduced.
、 unchanged.
、 increased.
、 doubled.
答案:
29、【 单选题 】
quality control is normally performed by the (    ) . [2.5分]
、 qa personnel
、 project team
、 operating personnel
、 project management
、 none of the above.
答案:
30、【 单选题 】
situations calling for a matrix organization include outside pressure for dual focus, (    ) and
pressure for high information processing
capability. [2.5分]
、 pressure for clear accountability
、 pressure for reduced duplication of effort
、 pressure for shared resources
、 pressure for formalized communication
、  
答案:
31、【 单选题 】
non-conformance penalties are a form of (    ). [2.5分]
、 quality incentive
、 risk sharing
、 contract negotiations
、 quality assurance programs
、 none of the above.
答案:
32、【 单选题 】
the net present value of $110 one year from now at 10% is: [2.5分]
、 100
、 120
、 121
、 $100 less taxes
、 $100 less taxes and interest
答案:
33、【 单选题 】
the receiver filters messages based on all but the following: [2.5分]
、 language
、 distance
、 culture
、 knowledge
、 authority/reputation
答案:
34、【 单选题 】
going from level 2 to level 4 in the work breakdown structure will result in [2.5分]
、 less estimating accuracy
、 better control of the project
、 lower status reporting costs
、 a greater likelihood that something will fall through the cracks
、 none of the above
答案:
35、【 单选题 】
there are hard causes of conflict (e.g. conflicting schedules) and soft causes. soft causes are as important as hard causes. soft causes
include diversity of disciplinary expertise, (    ), and the project manager's power of reward and punishment. [2.5分]
、 performance tradeoffs
、 ambiguity of roles
、 administrative procedures
、 determining earned value
、  
答案:
1
共1页,共35个题库
共1页,共35个题库
轻速云给您提供更好的在线考试系统服务!
推荐
推荐题库
众多企事业单位的信赖之选
36万+企事业单位的共同选择
查看更多合作案例
众多企事业单位的信赖之选
开始使用轻速云组织培训考试
四步组织一场考试答题,一键搭建企业培训平台
免费使用 免费使用 预约演示
咨询热线
400-886-8169
周一到周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1 轻速云科技提供专业的在线考试系统、在线培训系统
联系我们
客服热线客服热线:400-886-8169 | 周一至周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1
轻速云科技提供专业的在线考试系统、在线培训系统
在线咨询 400-886-8169