1、【
单选题
】
a proven effective means to insure quality conformance is to:
[2.5分]
、
delegate accountability to subordinates
、
revise quality specifications to match quality measurements
、
train workers in proper quality methods
、
inspect quality into the product
、
make quality a higher priority than cost or schedule
答案:
2、【
单选题
】
risk mitigation involves all but which of the following:
[2.5分]
、
developing system standards (policies, procedure, responsibility standards)
、
obtaining insurance against loss
、
identification of project risks
、
performing contingent planning
、
developing planning alternatives
答案:
3、【
单选题
】
communication management is best described as conducting or supervising
[2.5分]
、
the way we listen
、
the way we speak
、
the way we feel
、
the exchange of information
、
perfect documentation activities
答案:
4、【
单选题
】
good project objectives must be:
[2.5分]
、
general rather than specific
、
established without considering resource bounds
、
realistic and attainable
、
overly complex
、
measurable, intangible and verifiable
答案:
5、【
单选题
】
the cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:
[2.5分]
、
payment authorization
、
bid cost considerations
、
release payment
、
back charge
、
none of the above.
答案:
6、【
单选题
】
increasing resources on the critical path activities may not always shorten the length of the project because:
[2.5分]
、
certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).
、
safety, osha and epa may have placed restrictions on the number of people used on certain activities or in the physical location of the
project.
、
the skill level of the added resources might not be appropriate for the activities to be performed.
、
adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)
、
all of the above.
答案:
7、【
单选题
】
the sequential steps that define the process for successfully completing a project is:
[2.5分]
、
implementation plan
、
a life cycle
、
development plan
、
a critical path
、
management plan
答案:
8、【
单选题
】
universal characteristics of effective project managers include such skills as communication, decision-making, planning, ability to identify
problems and:
[2.5分]
、
performing feasibility studies
、
proposal preparation
、
being close to the customer
、
maturity
、
none of the above are universal characteristics
答案:
9、【
单选题
】
which of the following time robbers end up creating additional work for the project manager and the project office?
[2.5分]
、
failure to delegate
、
changes without notification or direction
、
unreasonable time constraints
、
over directing people
、
all of the above
答案:
10、【
单选题
】
which of the following is not a measure of the profitability of a project or program?
[2.5分]
、
return on original investment.
、
net present value.
、
depreciation.
、
discounted cash flow.
、
none of the above
答案:
11、【
单选题
】
you are giving your team instructions on how to perform a new test which is different from the way that the team had performed it previously.
the best way to verify that the learn understands what you want is to:
[2.5分]
、
obtain feedback
、
analyze the team's perceptions barriers
、
uses gestures in presenting the instructions
、
analyze the team's decoding skills
、
analyze the team's encoding skills
答案:
12、【
单选题
】
a common way by which executives provide the project manager with written authority is through:
[2.5分]
、
a common job description for all project managers
、
an appointment letter
、
a project charter
、
all of the above
、
b and c only
答案:
13、【
单选题
】
( ) is a formal invitation containing a scope of work which seeks a formal response (proposal) describing both methodology and
compensation to form the basis of a contract.
[2.5分]
、
request for proposal
、
invitation to bid
、
request for quotation
、
intention for bid
、
none of the above.
答案:
14、【
单选题
】
by which means is a contractor able to control cost overruns due to changing requirements?
[2.5分]
、
project data review
、
change order
、
purchase order amendment
、
change control
、
none of the above.
答案:
15、【
单选题
】
surveys have shown that the primary skill needed to be a project manager is communication skill. the typical project manager spends
approximately ( )percent of his or her time communicating.
[2.5分]
、
40-50
、
50-60
、
60-75
、
75-90
、
90-95
答案:
16、【
单选题
】
douglas mcgregor's theory y advocates that the average worker:
[2.5分]
、
dislikes work and avoids it whenever possible
、
must be closely supervised and even threatened with punishment
、
avoids increased responsibility
、
wants self-respect
、
none of the above
答案:
17、【
单选题
】
the work breakdown structure (wbs) is the basis for communicating:
[2.5分]
、
project scope, cost control, schedule, quality
、
project objectives, dependencies, plan, cost control
、
project scope, schedule, staffing, cost control
、
project scope, quality, schedule, dependencies
、
project budget, schedule, risk factors, work assignments.
答案:
18、【
单选题
】
the quality objectives are approved in the conceptual stage of the project by the:
[2.5分]
、
project engineer
、
project manager
、
functional manager
、
quality assurance manager
、
project owner
答案:
19、【
单选题
】
feasibility studies occur in which life cycle phase (s)?
[2.5分]
、
conceptual
、
conceptual or development
、
execution
、
preliminary planning
、
any life cycle phase
答案:
20、【
单选题
】
project managers must know:
[2.5分]
、
what kind of message to send
、
to whom to send the message
、
how to translate the message into a language that everyone can understand
、
all of the above
、
a and b only
答案:
21、【
单选题
】
total project risk:
[2.5分]
、
should not be calculated for small projects
、
is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the
project.
、
is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.
、
a and b
、
a and c
答案:
22、【
单选题
】
quality attributes
[2.5分]
、
are used to determine how effectively the organization accomplishes its goals
、
can be objective or subjective in nature
、
are specific quality characteristics for which a product is designed, built, and tested.
、
a and b
、
b and c
答案:
23、【
单选题
】
( ) is a narrative description of the work to be accomplished or resource to be supplied.
[2.5分]
、
purchase order
、
level of effort work
、
scope of work
、
contract stipulation
、
none of the above.
答案:
24、【
单选题
】
a line manager provides you with three estimates for his activity in your pert network. his estimates are 2 weeks optimistically, 4 weeks
most likely, and 12 weeks pessimistically. the expected time which would appear on the chart would be:
[2.5分]
、
4 weeks
、
5 weeks
、
6 weeks
、
7 weeks
、
none of the above.
答案:
25、【
单选题
】
risk event probability is defined as:
[2.5分]
、
the total number of possible events divided into the expectations or frequency of the risk event
、
the number of times the risk event may occur
、
the fraction of the total project tasks which may be affected by the risk event
、
the total number of possible events divided into the consequences of the risk event.
、
a and b
答案:
26、【
单选题
】
scheduling systems such as pert, adm, and pdm are project management tools to be used by:
[2.5分]
、
the project manager and project office personnel.
、
the project team and functional managers.
、
the project sponsor.
、
all of the above.
、
a and b only.
答案:
27、【
单选题
】
in project risk management, risk response may include actions to:
[2.5分]
、
reduce the probability of risk events
、
change the scope, budget, schedule or quality specifications of the project
、
reduce the consequences or severity of impacts of a potential risk event
、
a and c
、
all of the above.
答案:
28、【
单选题
】
the planned cost for the total project at its inception is called the ( ).
[2.5分]
、
cost of goods sold.
、
depreciable value.
、
budgeted cost.
、
all of the above.
、
b and c only.
答案:
29、【
单选题
】
researching, organizing and recording pertinent information is called:
[2.5分]
、
alternative analysis
、
information gathering
、
configuration management
、
post project analysis
、
all of the above
答案:
30、【
单选题
】
a process characteristic has a true mean of 150 and a true standard deviation of 20. a sample of 25 items is taken from this process. the
standard error of the estimate is:
[2.5分]
、
0.2
、
0.8
、
4
、
5
、
7.5
答案:
31、【
单选题
】
the budget associated with scope changes that have been approved but not planned for yet, is referred to a(n) ( ) budget.
[2.5分]
、
unauditable.
、
undistributed.
、
preauthorized.
、
contingency.
、
in-process.
答案:
32、【
单选题
】
network schedules are prepared during the ( ) phase and updated during the ( ) phase.
[2.5分]
、
conceptual, execution.
、
development, implementation.
、
development, close-out.
、
implementation, close-out.
、
planning, finishing.
答案:
33、【
单选题
】
the project manager must be concerned with building a closely knit team. during the project kickoff meeting, the project manager can get a
good start at team building by providing the team with:
[2.5分]
、
proposed salary increases if the project is successful
、
bonuses for early completion date
、
a promise of future assignments
、
well-defined project objectives
、
linear responsibility charts
答案:
34、【
单选题
】
scope management:
[2.5分]
、
entails managing the project's work content.
、
is a subset of configuration management and as such is performed by cm specialists.
、
is concerned with naming all activities performed, the end products which results and the resources consumed.
、
is not a concern of the project manager.
、
none of the above.
答案:
35、【
单选题
】
to determine whether or not the employee correctly understands the message, the project manager needs to:
[2.5分]
、
reduce the filtering
、
eliminate barriers
、
obtain feedback
、
use more than one medium
、
use all of the above.
答案:
36、【
单选题
】
what is the relative priority of project cost, schedule and quality?
[2.5分]
、
1)cost - 2)schedule - 3)quality
、
1)quality - 2)schedule - 3)cost
、
1)quality - 2)cost - 3)schedule
、
1)schedule - 2)quality - 3)cost
、
all are of equal priority
答案:
37、【
单选题
】
the traditional organizational form has the disadvantage of:
[2.5分]
、
complex functional budgeting
、
poorly established communication channels
、
no single focal point for clients/sponsors
、
slow reaction capability
、
inflexible use of manpower
答案:
38、【
单选题
】
( ) is a method of procurement where a contract results from a bid which may be changed through bargaining.
[2.5分]
、
acquisition
、
contract negotiation
、
procurement
、
purchase negotiation
、
none of the above.
答案: