1、【
单选题
】
which of the following is referred to as payback period:
[2.5分]
、
the number of periods required to recover the initial investment
、
the rate of return on the investment
、
the number of periods required to bring project cost back to the original budget, based on current performance
、
loan payment schedule
、
none of the above
答案:
2、【
单选题
】
project life cycles provide a better means of measurement of progress and control. the four phases of a project are conceptual development,
( ), ( ), and ( ).
[2.5分]
、
preliminary planning, detail planning, closeout
、
implementation, reporting, termination
、
development, implementation, termination
、
execution, reporting, finishing
、
implementation, termination, post-audit review
答案:
3、【
单选题
】
response planning is the responsibility of the functional areas and considers
[2.5分]
、
mitigation.
、
deflection.
、
contingency planning.
、
unforeseen occurrences.
、
all of the above.
答案:
4、【
单选题
】
which one of the following is not an acquisition method?
[2.5分]
、
advertising
、
invitation
、
negotiation
、
purchase
、
all are acquisition methods
答案:
5、【
单选题
】
the definitive terms of a contract are written during which of the following contract phases?
[2.5分]
、
contract phase
、
post-award phase
、
award phase
、
pre-award phase
、
requirement phase
答案:
6、【
单选题
】
at least ( )of the cost of quality are the direct responsibility of management.
[2.5分]
、
0.25
、
0.85
、
0.5
、
1
、
0.33
答案:
7、【
单选题
】
the sending or conveying of information from one place to another is the process of
[2.5分]
、
networking
、
transmitting
、
interacting
、
promoting
、
interfacing
答案:
8、【
单选题
】
fast tracking means to:
[2.5分]
、
speed up a project through parallel tasks.
、
swap one task for another.
、
reduce the number of tasks if possible.
、
b and c.
、
none of the above.
答案:
9、【
单选题
】
which of the following types of cost are relevant to making financial decisions:
[2.5分]
、
sunk cost
、
opportunity cost
、
material cost
、
a and c only
、
b and c only
答案:
10、【
单选题
】
formal written correspondence is mandated in which of the following situations:
[2.5分]
、
product undergoes casual in-house testing
、
client requests additional work not covered under contract
、
project manager calls a meeting
、
b and c only
、
none of the above
答案:
11、【
单选题
】
the delphi method is ( ) .
[2.5分]
、
used to derive a consensus arriving at a convergent solution
、
useful in determining probability relating to future events.
、
used with questionnaires based on established scenarios.
、
continued as an iterative process until a solution is reached.
、
all of the above.
答案:
12、【
单选题
】
in preparing a good project definition, experienced project managers will:
[2.5分]
、
concentrate mainly on the end product rather than costs or benefits. these come later.
、
realize that only the "tip of the iceberg" may be showing. as a project manager, you must get beneath it.
、
understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.
、
try to convert objectives into quantifiable terms.
、
all of the above
答案:
13、【
单选题
】
the positive value of conflict is underestimated. properly managed, conflict is a valuable tool, particularly when
[2.5分]
、
a diversion is needed
、
conflictive situations are in their early stages and emotional involvement is low
、
conflictive situations are in their late stages and emotional involvement is high
、
conflict may cause a loss of status or position power
、
答案:
14、【
单选题
】
in which of the following is the cost of risk hidden by the contractor?
[2.5分]
、
firm fixed price contract
、
fixed price plus incentive
、
cost plus fixed price
、
cost plus percentage of cost
、
a and b
答案:
15、【
单选题
】
management of a certain building was receiving complaints about slow elevator service. the solution adopted was to add mirrors in the
lobbies to reduce boredom while passengers waited. this is an example of ( ) .
[2.5分]
、
kepner-tregoe method
、
potential problem analysis
、
decision analysis
、
creative problem solving
、
none of the above
答案:
16、【
单选题
】
under the terms of 2/10 net 30, the buyer may:
[2.5分]
、
deduct 10% of the invoice amount for payment within 30 days
、
deduct 2% of the invoice for payment within 10 days
、
incurs a penalty on 10% for payments more than 30 days late
、
settle the invoice with 2 equal payments; one within 10 days and the other within 30 days
、
none of the above
答案:
17、【
单选题
】
pure risk differs from business risks because pure risk's ( ) .
[2.5分]
、
include chances of both profit or loss associated with the business.
、
include chances of loss and no chances for profit associated with the business.
、
must incur personal loss with business liability.
、
must incur business liability associated with loss of pure profit.
、
b and c
答案:
18、【
单选题
】
which of the following can result in misinterpretation of the statement of work?
[2.5分]
、
using imprecise language (i.e. nearly, approximately)
、
mixing tasks, specifications, special instructions and approvals
、
no pattern, structure or chronological order
、
wide variation in the size of tasks or details of work
、
all of the above
答案:
19、【
单选题
】
the actual configuration of a pert/cpm network ( ) the amount of resources that can be devoted to the project.
[2.5分]
、
increases.
、
is not affected by
、
does not require
、
is heavily dependent upon
、
is the only means of determining
答案:
20、【
单选题
】
amount at stake is the ( ) .
[2.5分]
、
function of planned time/real time project costs.
、
risk identified in successful project completions.
、
(standard project deviation + expected costs)/6
、
cost of investment loss + least cost to restore status quo.
、
inherent risk at conception altered by standard project deviations.
答案:
21、【
单选题
】
the following types of costs are relevant to making a financial decision except:
[2.5分]
、
opportunity costs
、
direct costs
、
sunk cost
、
unavoidable costs
、
none of the above
答案:
22、【
单选题
】
in communications management, to assimilate through the mind or senses (as in new ideas) is the process of
[2.5分]
、
understanding
、
communicating
、
receiving
、
decoding
、
comprehending
答案:
23、【
单选题
】
in general, the best long-lasting approach to settling project conflict is the ( ) approach .
[2.5分]
、
problem solving
、
compromise
、
withdrawal
、
smoothing
、
forcing
答案:
24、【
单选题
】
the standard types of communication include all but
[2.5分]
、
written
、
verbal
、
telepathic
、
nonverbal
、
none of the above
答案:
25、【
单选题
】
in which of the following cost estimating techniques are statistics models used:
[2.5分]
、
nonparametric cost estimating
、
parametric cost estimating
、
life cycle cost estimating
、
bottom-up estimating
、
all of the above.
答案:
26、【
单选题
】
( ) of the extra costs of the project can often be attributed to a lack of quality.
[2.5分]
、
0.12
、
0.15
、
0.2
、
0.25
、
less than 10%
答案:
27、【
单选题
】
a budget estimate should give the manager cost data accurate to within:
[2.5分]
、
-5 to +10 percent of actual cost
、
-25 to +75 percent of actual cost
、
-30 to +75 percent of actual cost
、
-10 to +25 percent of actual cost
、
none of the above
答案:
28、【
单选题
】
the ( ) specification delineates specific end use capabilities which can be tested in the acceptance procedure.
[2.5分]
、
performance
、
functional
、
technical
、
base line
、
operational
答案:
29、【
单选题
】
the contractual statement of work (csow)
[2.5分]
、
must be the same as the proposal statement of work
、
does not identify reporting requirements
、
can be at a different level of detail (i.e. wbs level) than the proposal statement of work
、
identifies the contractor's organizational structure for the project
、
all of the above
答案:
30、【
单选题
】
the key ingredient to a successful quality management program are ( ).
[2.5分]
、
management's quality philosophy, operational quality assurance and operational quality control.
、
quality evaluation methods and functional quality integrators.
、
technical quality administration, the technical quality specifications, and the quality process review.
、
quality evaluation methods, quality progress reviews and the technical quality specifications.
、
all of the above.
答案:
31、【
单选题
】
the key purpose of project control is to:
[2.5分]
、
plan ahead for uncertainties.
、
generate status reports.
、
keep the project on track.
、
develop the project road map.
、
all of the above.
答案:
32、【
单选题
】
cip embodies which of the following principals?
[2.5分]
、
constancy of purpose
、
customer focus and involvement
、
total involvement
、
teamwork
、
all of the above.
答案:
33、【
单选题
】
excessive flexibility in specifying requirements will ( ) the likelihood of time overruns.
[2.5分]
、
reduce.
、
eliminate.
、
double
、
increase
、
not affect
答案:
34、【
单选题
】
listening involves more than hearing sounds. the good listener
[2.5分]
、
repeats some of the things said
、
finishes the speaker's sentences
、
writes everything down
、
nods his head frequently
答案: