which of the following is referred to as payback period: [2.5分]
、 the number of periods required to recover the initial investment
、 the rate of return on the investment
、 the number of periods required to bring project cost back to the original budget, based on current performance
、 loan payment schedule
、 none of the above
答案:
2、【 单选题 】
project life cycles provide a better means of measurement of progress and control. the four phases of a project are conceptual development,
(    ), (    ), and (    ). [2.5分]
、 preliminary planning, detail planning, closeout
、 implementation, reporting, termination
、 development, implementation, termination
、 execution, reporting, finishing
、 implementation, termination, post-audit review
答案:
3、【 单选题 】
response planning is the responsibility of the functional areas and considers [2.5分]
、 mitigation.
、 deflection.
、 contingency planning.
、 unforeseen occurrences.
、 all of the above.
答案:
4、【 单选题 】
which one of the following is not an acquisition method? [2.5分]
、 advertising
、 invitation
、 negotiation
、 purchase
、 all are acquisition methods
答案:
5、【 单选题 】
the definitive terms of a contract are written during which of the following contract phases? [2.5分]
、 contract phase
、 post-award phase
、 award phase
、 pre-award phase
、 requirement phase
答案:
6、【 单选题 】
at least (    )of the cost of quality are the direct responsibility of management. [2.5分]
、 0.25
、 0.85
、 0.5
、 1
、 0.33
答案:
7、【 单选题 】
the sending or conveying of information from one place to another is the process of [2.5分]
、 networking
、 transmitting
、 interacting
、 promoting
、 interfacing
答案:
8、【 单选题 】
fast tracking means to: [2.5分]
、 speed up a project through parallel tasks.
、 swap one task for another.
、 reduce the number of tasks if possible.
、 b and c.
、 none of the above.
答案:
9、【 单选题 】
which of the following types of cost are relevant to making financial decisions: [2.5分]
、 sunk cost
、 opportunity cost
、 material cost
、 a and c only
、 b and c only
答案:
10、【 单选题 】
formal written correspondence is mandated in which of the following situations: [2.5分]
、 product undergoes casual in-house testing
、 client requests additional work not covered under contract
、 project manager calls a meeting
、 b and c only
、 none of the above
答案:
11、【 单选题 】
the delphi method is (    ) . [2.5分]
、 used to derive a consensus arriving at a convergent solution
、 useful in determining probability relating to future events.
、 used with questionnaires based on established scenarios.
、 continued as an iterative process until a solution is reached.
、 all of the above.
答案:
12、【 单选题 】
in preparing a good project definition, experienced project managers will: [2.5分]
、 concentrate mainly on the end product rather than costs or benefits. these come later.
、 realize that only the "tip of the iceberg" may be showing. as a project manager, you must get beneath it.
、 understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.
、 try to convert objectives into quantifiable terms.
、 all of the above
答案:
13、【 单选题 】
the positive value of conflict is underestimated. properly managed, conflict is a valuable tool, particularly when [2.5分]
、 a diversion is needed
、 conflictive situations are in their early stages and emotional involvement is low
、 conflictive situations are in their late stages and emotional involvement is high
、 conflict may cause a loss of status or position power
、  
答案:
14、【 单选题 】
in which of the following is the cost of risk hidden by the contractor? [2.5分]
、 firm fixed price contract
、 fixed price plus incentive
、 cost plus fixed price
、 cost plus percentage of cost
、 a and b
答案:
15、【 单选题 】
management of a certain building was receiving complaints about slow elevator service. the solution adopted was to add mirrors in the
lobbies to reduce boredom while passengers waited. this is an example of (    ) . [2.5分]
、 kepner-tregoe method
、 potential problem analysis
、 decision analysis
、 creative problem solving
、 none of the above
答案:
16、【 单选题 】
under the terms of 2/10 net 30, the buyer may: [2.5分]
、 deduct 10% of the invoice amount for payment within 30 days
、 deduct 2% of the invoice for payment within 10 days
、 incurs a penalty on 10% for payments more than 30 days late
、 settle the invoice with 2 equal payments; one within 10 days and the other within 30 days
、 none of the above
答案:
17、【 单选题 】
pure risk differs from business risks because pure risk's (    ) . [2.5分]
、 include chances of both profit or loss associated with the business.
、 include chances of loss and no chances for profit associated with the business.
、 must incur personal loss with business liability.
、 must incur business liability associated with loss of pure profit.
、 b and c
答案:
18、【 单选题 】
which of the following can result in misinterpretation of the statement of work? [2.5分]
、 using imprecise language (i.e. nearly, approximately)
、 mixing tasks, specifications, special instructions and approvals
、 no pattern, structure or chronological order
、 wide variation in the size of tasks or details of work
、 all of the above
答案:
19、【 单选题 】
the actual configuration of a pert/cpm network (    ) the amount of resources that can be devoted to the project. [2.5分]
、 increases.
、 is not affected by
、 does not require
、 is heavily dependent upon
、 is the only means of determining
答案:
20、【 单选题 】
amount at stake is the (    ) . [2.5分]
、 function of planned time/real time project costs.
、 risk identified in successful project completions.
、 (standard project deviation + expected costs)/6
、 cost of investment loss + least cost to restore status quo.
、 inherent risk at conception altered by standard project deviations.
答案:
21、【 单选题 】
the following types of costs are relevant to making a financial decision except: [2.5分]
、 opportunity costs
、 direct costs
、 sunk cost
、 unavoidable costs
、 none of the above
答案:
22、【 单选题 】
in communications management, to assimilate through the mind or senses (as in new ideas) is the process of [2.5分]
、 understanding
、 communicating
、 receiving
、 decoding
、 comprehending
答案:
23、【 单选题 】
in general, the best long-lasting approach to settling project conflict is the (    ) approach . [2.5分]
、 problem solving
、 compromise
、 withdrawal
、 smoothing
、 forcing
答案:
24、【 单选题 】
the standard types of communication include all but [2.5分]
、 written
、 verbal
、 telepathic
、 nonverbal
、 none of the above
答案:
25、【 单选题 】
in which of the following cost estimating techniques are statistics models used: [2.5分]
、 nonparametric cost estimating
、 parametric cost estimating
、 life cycle cost estimating
、 bottom-up estimating
、 all of the above.
答案:
26、【 单选题 】
(    ) of the extra costs of the project can often be attributed to a lack of quality. [2.5分]
、 0.12
、 0.15
、 0.2
、 0.25
、 less than 10%
答案:
27、【 单选题 】
a budget estimate should give the manager cost data accurate to within: [2.5分]
、 -5 to +10 percent of actual cost
、 -25 to +75 percent of actual cost
、 -30 to +75 percent of actual cost
、 -10 to +25 percent of actual cost
、 none of the above
答案:
28、【 单选题 】
the (    ) specification delineates specific end use capabilities which can be tested in the acceptance procedure. [2.5分]
、 performance
、 functional
、 technical
、 base line
、 operational
答案:
29、【 单选题 】
the contractual statement of work (csow) [2.5分]
、 must be the same as the proposal statement of work
、 does not identify reporting requirements
、 can be at a different level of detail (i.e. wbs level) than the proposal statement of work
、 identifies the contractor's organizational structure for the project
、 all of the above
答案:
30、【 单选题 】
the key ingredient to a successful quality management program are (    ). [2.5分]
、 management's quality philosophy, operational quality assurance and operational quality control.
、 quality evaluation methods and functional quality integrators.
、 technical quality administration, the technical quality specifications, and the quality process review.
、 quality evaluation methods, quality progress reviews and the technical quality specifications.
、 all of the above.
答案:
31、【 单选题 】
the key purpose of project control is to: [2.5分]
、 plan ahead for uncertainties.
、 generate status reports.
、 keep the project on track.
、 develop the project road map.
、 all of the above.
答案:
32、【 单选题 】
cip embodies which of the following principals? [2.5分]
、 constancy of purpose
、 customer focus and involvement
、 total involvement
、 teamwork
、 all of the above.
答案:
33、【 单选题 】
excessive flexibility in specifying requirements will (    ) the likelihood of time overruns. [2.5分]
、 reduce.
、 eliminate.
、 double
、 increase
、 not affect
答案:
34、【 单选题 】
listening involves more than hearing sounds. the good listener [2.5分]
、 repeats some of the things said
、 finishes the speaker's sentences
、 writes everything down
、 nods his head frequently
答案:
1
共1页,共34个题库
共1页,共34个题库
轻速云给您提供更好的在线考试系统服务!
推荐
推荐题库
众多企事业单位的信赖之选
36万+企事业单位的共同选择
查看更多合作案例
众多企事业单位的信赖之选
开始使用轻速云组织培训考试
四步组织一场考试答题,一键搭建企业培训平台
免费使用 免费使用 预约演示
咨询热线
400-886-8169
周一到周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1 轻速云科技提供专业的在线考试系统、在线培训系统
联系我们
客服热线客服热线:400-886-8169 | 周一至周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1
轻速云科技提供专业的在线考试系统、在线培训系统
在线咨询 400-886-8169