PMP认证考试练习题(17,18)
1、【 单选题
creation of project objectives: [2.5分]
allows for data collection and analysis and progress reporting against which standards of performance can be measured.
is accomplished by selection of measurable variables against which performance can be judged.
is required before funding of the project by the project sponsor.
all of the above.
a and b only
答案:
2、【 单选题
a legally binding document offered unilaterally is a (    ) . [2.5分]
purchase order
scope of work description
contract stipulation
level of effort proposal
request for proposal
答案:
3、【 单选题
a technical requirement has which of the following characteristics: [2.5分]
easy to understand
a communication tool between the user and the design team
written in non-technical language
developed in cooperation with the user
typically describe physical dimensions and performance requirements
答案:
4、【 单选题
during which phase of the project life cycle is the amount at stake lowest? [2.5分]
concept
development
execution
conclusion
c and d
答案:
5、【 单选题
if a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the project
manager should assume: [2.5分]
the message was understood
the message was not understood
the subordinate discarded the information
the information was not appropriate
none of the above.
答案:
6、【 单选题
techniques that can improve communication include: [2.5分]
establishing a single, one-way communications channel
avoiding face-to-face communication
using redundancy (i.e. saying it two different ways) whenever possible
disregarding the sensitivity of your receiver
all of the above.
答案:
7、【 单选题
the delphi method is well-suited for: [2.5分]
decision-making
forecasting
overhead rate estimating
all of the above
a and b only
答案:
8、【 单选题
inspection of a complex project according to specifications is accomplished by (    ). [2.5分]
inspection by attributes.
cyclical inspection
quality conformance inspection
original inspection
none of the above.
答案:
9、【 单选题
the zero defects concept [2.5分]
is a performance standard for management
is a motivational technique that promotes "doing it right the first time".
is used by management to communicate to all employees that everyone should do things right the first time.
a and c.
b and c
答案:
10、【 单选题
what tool have project managers come to use to identify all of the costs associated with a project. [2.5分]
a bill of materials
a gantt chart
an arrow diagram network.
a work breakdown structure.
b and c only.
答案:
11、【 单选题
the difference between the bcws and the bcwp is referred to as the: [2.5分]
schedule variance
cost variance.
estimate of completion
actual cost of the work performed
none of the above
答案:
12、【 单选题
"paraphrasing" is most closely associated with which part of the communication process? [2.5分]
encoding
decoding
barriers
feedback
none of the above.
答案:
13、【 单选题
(    ) is a receipt issued by a carrier for merchandise to be delivered to a party at some destination. [2.5分]
proforma invoice
inspection certificate
packing list
bill of lading
none of the above.
答案:
14、【 单选题
a program is characterized as: [2.5分]
a grouping or related tasks lasting one year or less.
a unique undertaking having a definite time period.
a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.
a project with a cost over $1 million.
none of the above.
答案:
15、【 单选题
a gantt chart is useful in determining: [2.5分]
the level of effort for a task
when a task starts and stops
how tasks are related to each other
who is assigned to do a task
all of the above.
答案:
16、【 单选题
a contract originated bilaterally may be developed by (    ) . [2.5分]
quotation request from suppliers
proposal request
bid invitation release
b and c
all of the above.
答案:
17、【 单选题
in a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance
review? [2.5分]
not working directly with the assigned functional employees
employees spend only a short amount of time assigned to the project
not being knowledgeable enough to evaluate employees on technical judgment
all of the above
a and b only
答案:
18、【 单选题
from an operating or functional perspective, there are various objectives of purchasing and materials management. which is not one of these
objectives? [2.5分]
to buy competitively
to support company operations with an uninterrupted flow of materials and services
to develop reliable and effective sources of supply
to achieve maximum integration with the other departments of the firm
to attain approval from each department of every purchase
答案:
19、【 单选题
upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are
referred to as the: [2.5分]
baseline costs
budgeted costs.
estimates upon completion costs
scheduled costs
none of the above
答案:
20、【 单选题
in order to achieve long-term quality improvements, management must do the following: [2.5分]
motivate the employees with seminars, contests, and institute programs such as "quality improvement' day.
create a quality control department and give the head of the department ultimate responsibility for quality improvement.
implement of a formal quality control program with worker and management involvement.
establish financial incentive packages for worker.
a and d
答案:
21、【 单选题
which of the following is not a definition to determine a product's ability to operate as intended? [2.5分]
distance
performance
function
condition
all are definitions
答案:
22、【 单选题
team members want to work for a project manager that can provide them with career path planning. in which organizational form is career
path planning difficult for project employees? [2.5分]
matrix
pure project
project coordinator
project expediter
classical/traditional
答案:
23、【 单选题
the swiftest and most effective communications take place among people with [2.5分]
common points of view
dissimilar interests
advanced degrees
the ability to reduce perception barriers
good encoding skills
答案:
24、【 单选题
a work breakdown structure is most useful for: [2.5分]
identifying individual tasks for a project
scheduling the start of tasks
developing a cost estimate
determining potential delays
a and c
答案:
25、【 单选题
typically, during which phase in a project life cycle are most of the project expenses incurred. [2.5分]
concept phase
development of design phase
execution phase.
termination phase.
none of the above
答案:
26、【 单选题
the primary consideration of product management is to know the (    ). [2.5分]
probability of product's performance with specified parameters
ability the product has to perform its intended function
ability of a product to be produced within existing parameters
functionality the product will provide over its useful life
all of the above
答案:
27、【 单选题
communication always makes use of. [2.5分]
symbols
words
language
gestures
all of the above.
答案:
28、【 单选题
fixed-price contracts place more risk on the (    ) . [2.5分]
owner
contractor
seller
b and c
all of the above.
答案:
29、【 单选题
the reason that cost management is so difficult in project management is that: [2.5分]
projects by definition and nature are non-recurring events and are therefore difficult to predict.
there are no tools for identifying project tasks.
project managers do not care about tracking costs, as only schedules are important to all project managers.
a and b only
b and c only
答案:
30、【 单选题
the best way to insure quality conformance is to (    ). [2.5分]
distribute the responsibility to subordinates.
maintain total control.
train each worker to implement the work.
inspect quality into the project.
none of the above.
答案:
31、【 单选题
using visual aids during management/customer presentations will: [2.5分]
hold the interest of the audience
strengthen the learning process by adding a visual dimension to the auditory dimension
stay in view longer, thus bringing back listeners who may have strayed
all of the above.
a and b only
答案:
32、【 单选题
the project charter is developed by: [2.5分]
senior management
the customer
the project manager
both a and c
none of the above.
答案:
33、【 单选题
a contract is legally binding and must comprise all but one of the following: [2.5分]
legal capacity
mutual assent
approved negotiations
consideration
legality
答案:
34、【 单选题
when a project manager is running over the budgeted costs, the project manager can typically (    ) to attempt to get the project back on
budget. [2.5分]
reduce features and/or functionality
increase risk.
incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
all of the above.
a and b only
答案:
1
1页,共34个题库
1页,共34个题库
轻速云给您提供更好的在线考试系统服务!
推荐
推荐题库
众多企事业单位的信赖之选
36万+企事业单位的共同选择
查看更多合作案例
众多企事业单位的信赖之选
开始使用轻速云组织培训考试
四步组织一场考试答题,一键搭建企业培训平台
免费使用 免费使用 预约演示
咨询热线
400-886-8169
周一到周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1 轻速云科技提供专业的在线考试系统、在线培训系统
联系我们
客服热线客服热线:400-886-8169 | 周一至周日 8:00-22:00
©2025 轻速云 苏ICP备16049646号-1
轻速云科技提供专业的在线考试系统、在线培训系统
在线咨询 400-886-8169